
SECTOR : Construction
PROJECT : Construction of a data centre and its annex building.
ASSIGNMENT : Studies, sizing (HV / LV power) and modelling of the 3D model.
SOFTWARE USED : REVIT, AUTOCAD, NAVISWORKS, DYNAMO, CANECO BT and Pack office.
INTERVENTION
Modelling and implementation of CFO/CFA electrical equipment :
- Cable trays and bar sheaths,
- Lighting,
- Electrical panels,
- Power equipment (transformers, generators, etc.),
- Security equipment (camera, emergency unit, access control),
- Computer equipment (servers, network connections),
- Realization of HV and LV synoptics.
Study and design basis for the electrical power supply :
- Studies on possible operating scenarios,
- Design of power balances,
- Sizing of the cable
- Sizing and choice of protective equipment,
- Preparing reservation plans,
- Preparing detailed views (cross-sections and 3D),
- Synthesis with the various technical batches,
- Creation of view templates,
- Preparation of rendering plans (derivable),
- Management and coordination of 3D models.
Ils nous font confiance














SUPPORTED BY :
